The 5 Step Checklist For A More Mature, Robust Quality Management System

Pharma Best Practices Webinars

/@pbpw947

Published: January 6, 2022

Open in YouTube
Insights

This webinar, presented by independent consultant Tobias Kuners, outlines a five-step checklist and a systems maturity model designed to help pharmaceutical and life sciences organizations develop a mature and robust Quality Management System (QMS). The core premise is that QMS maturity is not simply a function of age, but a deliberate process of assessment, gap closure, and continuous improvement aimed at creating a compliant, comprehensive, and consistent repository for all systems, procedures, and documents meeting regulatory requirements. The speaker emphasizes that maturing the QMS is crucial for maintaining continuous inspection readiness and optimizing operational efficiency, particularly in complex environments like biotech, cell & gene therapy, and radiopharmaceutical facilities.

The proposed methodology centers on a five-level QMS maturity model, ranging from Level 1 (Ad Hoc/Starting) to Level 5 (Adaptive/Optimized). The process begins with Step 1: Setting the Standards, where organizations determine local and regional regulatory requirements (e.g., FDA, EMA, Annex 1 in Europe) to establish the desired "to-be" state. This leads to a Gap Assessment against the current QMS procedures. Step 2 involves developing a Consolidation Plan to close identified gaps, which includes writing new SOPs, consolidating overlapping procedures, and removing overly detailed elements that hinder knowledgeable staff and lead to deviations. Step 3 focuses on Execution and Monitoring, highlighting the critical need for senior leadership oversight via a steering committee to set realistic timelines, prioritize tasks, and allocate necessary resources, ensuring the project doesn't get "crunched between day-to-day activities."

A significant portion of the presentation is dedicated to defining the maturity levels across various organizational dimensions (e.g., Organization, Metrics, Culture, Compliance, Process, Technology, Governance, Client Experience). For instance, a Level 3 (Stable/Managed) organization is characterized by having the right number of people with the correct knowledge, metrics that show the organization is "in control," and being an "early follower" of new compliance regulations. Moving to Level 4 (Optimized/Predictive) requires continuous improvement portfolios, predictive performance metrics (leading indicators over lagging indicators), and transferable processes that can be shared across an enterprise. The speaker also details a framework for organizing the QMS maturation project into three modules—Operations, Quality, and Business—each overseen by a management champion (ideally cross-functional leaders) to foster collaboration and provide support to sub-project teams responsible for specific elements like downstream processing, maintenance, or regulatory affairs.

Detailed Key Takeaways

  • QMS Maturity is a Strategic Initiative: A mature QMS is defined by its robustness, compliance, and consistency, not its age. The process of maturation should be driven by corporate expectations and evolving regulatory insights (e.g., preparing for changes like EU Annex 1).
  • The Five-Step Maturation Process: The core steps include setting regulatory standards, conducting a gap assessment, developing a resource-constrained consolidation plan, executing and monitoring the plan with leadership oversight, and finally, achieving continuous improvement.
  • Leadership Buy-in is Critical for Execution: A steering committee comprised of senior leadership must oversee the initiative to manage resource allocation, set realistic timelines, and ensure project continuity, preventing the QMS project from being sidelined by daily operational demands.
  • Shifting from Lagging to Leading Metrics: To achieve Level 4 maturity, organizations must transition from relying on lagging indicators (e.g., monthly financials) to predictive performance metrics (leading indicators) that allow leadership to make real-time corrections and stay in the "driver's seat."
  • Graduation Criteria Define Success: Before starting the project, specific "graduation criteria" must be established for each target level (e.g., Level 3 stability). These criteria include a robust Risk Register, System Health Metrics, established SIPOC models for all processes, and demonstrated system stability under stress.
  • Optimize Procedures for Efficiency: The consolidation plan should actively reduce the number of procedures by combining overlaps and removing excessive detail. This reduces training burden, minimizes deviations caused by strict adherence issues, and frees up staff time for quality activities.
  • Technology as a Robustness Enabler: Moving toward Level 3 and 4 maturity requires leveraging robust technology and computerized systems to reduce the possibility of human intervention, which is cited as the biggest source of variability in processes. This includes adopting computerized systems, VR, and augmented reality for training and guided work.
  • Cross-Functional Championship: The QMS project structure should assign management champions (ideally site leadership members from a different functional area) to the Operations, Quality, and Business modules. This promotes cross-departmental understanding and collaboration, which is fundamental to QMS success.
  • Client Experience (Internal and External): Awareness of client experience—both internal (department-to-department service) and external (patient/customer quality)—is a metric that only develops once the organization achieves stability (Level 3) and moves toward collaboration (Level 4).
  • Justifying Investment: While specific costs are facility-dependent, the investment is justified by avoiding detrimental outcomes like warning letters (loss of market authorization) or by quantifying the time saved through optimized procedures (reduced training hours, fewer deviations).
  • Process Transferability: A Level 4 QMS should have processes that are "transferable," meaning they are so robust and well-documented that they can be successfully shared and implemented by other facilities within the corporate enterprise.
  • Risk Management Evolution: Risk management must evolve from simply having a risk register (Level 3) to prospectively and actively managing risks (Level 4), meaning the organization is ahead of the curve in anticipating and mitigating potential threats.

Key Concepts

  • QMS Maturity Model: A framework used to assess and categorize the robustness and completeness of an organization's Quality Management System across defined levels (e.g., Ad Hoc, Incomplete, Managed/Stable, Optimized/Predictive, Adaptive).
  • SIPOC (Suppliers, Inputs, Process, Outputs, Customers): A high-level process mapping tool used to identify critical internal and external suppliers and customers for every process, ensuring comprehensive coverage and understanding of interdependencies.
  • Leading vs. Lagging Metrics: Leading metrics predict future performance and allow for proactive intervention (e.g., daily production rate against goal), while lagging metrics report on past performance (e.g., end-of-month financials). Maturity requires a focus on leading indicators.
  • Risk Register: A comprehensive overview of potential risks, identified mitigation actions, and the resulting residual risk level, which must be managed to ensure product and patient safety.
  • Transferable Processes: Processes and procedures that are so robust and well-documented that they can be successfully deployed and replicated across multiple facilities within an enterprise.